Blog Post

19/01/2022

Revitalising Brisbane’s City Beach Boardwalk

MasterEmaco & MasterProtect

Boardwalks are high-traffic public areas, so their strength, durability, and aesthetics must be maintained over time. O’Connor Kelly and Master Builders Solutions recently completed a $7 million refurbishment project at the City Beach Boardwalk, which runs along the Brisbane River.

Corrosion Repairs

Repairing piles and beams underneath the boardwalk as well as replacing deck panels, patch repairs, and sealing concrete to eliminate any further corrosion.

Solutions
  • MasterProtect 8065CP: Installation of sacrificial anodes for corrosion protection.

  • MasterEmaco N 5200CI: Used to pack around the cathodic protection anodes before placing MasterEmaco S 5440CI on the pile caps.

  • MasterEmaco S 822CI: Spray-applied repair mortar for cathodic protection overlays.

  • MasterEmaco N 5100: Used to fill honeycombs and pinholes in concrete deck panels as a topping render (up to 3mm thick).

  • MasterProtect H 1150: An aqueous cream applied to eliminate the possibility of excess product dropping into and potentially contaminating the Brisbane River.

Contact Information

For more information, contact:

Andrew Sarkady
National Industry Advocate Civil Infrastructure – Transport

Phone: 0418 530 763